Classroom and Computer Site Updates - Summer 2014

It was a busy summer for the Classroom Technology Support team (as summers always are). A dozen classrooms had their capabilities expanded with new equipment. More than two hundred computers in over eighty sites were replaced as part of regular life cycle maintenance. Working in concert with Facilities, eight new classrooms that previously had no technology support became high technology classrooms. And design work was done for two new sites to be completed in the fall. You can browse the complete list of LTS-supported sites and classrooms online. A summary of the upgrades is below:

Classroom A/V Upgrades

  • Coppee 101 - Updating with laser projector, installing new screen, adding HDMI, mini displayport and VGA into a cable cubby, installing a new switcher/scaler with CAT 6 to projector.
  • Coppee 105 - Updating with laser projector, installing new screen, adding HDMI, mini displayport and VGA into a cable cubby, installing a new switcher/scaler with CAT 6 to projector.
  • Iacocca B131 - Updating with laser projector, installing new screen, adding HDMI, mini displayport and VGA into a cable cubby, installing a new switcher/scaler with CAT 6 to projector, adding document camera.
  • Linderman 302 - Updating projector, installing new screen, adding HDMI, mini displayport and VGA into a cable cubby, installing a new switcher/scaler with fiber to the projector.
  • Maginnes 290 - Updating with laser projector, adding HDMI, mini displayport and VGA into a cable cubby, installing a new switcher/scaler with CAT 6 to projector, adding document camera.
  • RBC 70 - Updating with laser projector, installing new screen, install new DVI DA, install direct connect HDMI cable to projector.
  • RBC 50 - Updating with laser projector, installing new screen, install new DVI DA, install direct connect HDMI cable to projector.
  • RBC 201 - Updating with laser projector, add instructor's station PC.
  • RBC 241 - Add instructor's station PC.
  • RBC 261 - Add instructor's station PC.
  • Whitaker 257 - Updating with laser projector, installing new DVI DA, install direct connect HDMI cable to projector.
  • Xmas 303 - Updating projector, installing new screen, install new lectern wing with cable cubby with mini displayport, HDMI and VGA, installing a new switcher/scaler with fiber to projector.

Classroom A/V Upgrade Designs

  • Iacocca A235 - Update with laser projector, add 70" display w/ camera and soundbar, HDMI.
  • Iacocca E104 - Reconfiguration of the room: Zone 1: wide screen replaces 4:3, new laser projector, control PC and monitor on wall arm to be moved, add HDMI; Zone 2: New laser projector, reuse screen but in wide format, add HDMI; Zone 3: Remove existing projector and install wall mounted 70" Mondo pad, add HDMI.

Adding technology to non-tech classrooms

  • Chandler 315 - Wall mounted 80" flat display, button controller, wall mounted input plate with HDMI, VGA/Audio and Composite Video.
  • Drown 001 - 80" flat display, ceiling speakers, HDMI, mini displayport and VGA into a cable cubby, 7" touch panel, blu-ray, Enova switcher/scaler, PC, motion detector.
  • Drown 019 - 80" flat display, ceiling speakers, HDMI, mini displayport and VGA into a cable cubby, 7" touch panel, blu-ray, Enova switcher/scaler, PC, motion detector.
  • Lewis 309 - Laser projector, HDMI, mini displayport and VGA into a cable cubby, 7" touch panel, blu-ray, Enova switcher/scaler, PC, motion detector.
  • Mudd 253 - New lectern, touch panel, document camera, laser projector, wide screen, computer, surge protection, ceiling speakers, PC, motion detector, Enova switcher/scaler, cable cubby with VGA, composite video, mini displayport and HDMI, blu-ray.
  • Packard 503 - Laser projector, wide screen, Enova switcher/scaler, HDMI, mini displayport and VGA into a cable cubby, 7" touch panel, blue-ray, PC, motion detector.
  • RBC 71 - Add computer, Enova switcher/scaler, cable cubby, motion detector.
  • RBC 251 - Add computer, Enova switcher/scaler, cable cubby, motion detector.

Computer Site Lifecycle Upgrades

  • EWFM 292 - 13 computers.
  • Drown 10 - 23 computers.
  • Drown 20 - 23 computers.
  • Saucon Village - 5 computers.
  • RBC 60 - 19 computers.
  • RBC 50 - 25 computers.
  • RBC 70 - 25 computers.
  • Mohler 444 - 17 computers, printer.
  • Classrooms - 79 LTS classrooms.